ST. GREGORY’S SCHOOL FOR BOYS

ST. GREGORY’S  SCHOOL FOR BOYS

St Gregory has an enrollment of 210 boys. The school was using an existing 60′ x 40′ gym, which is inadequate for their current needs. The project scope called for a new gym, with a playing court surface of 45′ x 80′ as well as modifying and expanding other existing spaces in the building. The new gym contains pull-out bleachers, new locker rooms, an accessible stage, additional gym storage and a new entrance lobby with a chapel and connecting link to the existing school building. There will also be public restroom and refreshment facilities to serve school functions in the new gym.

Additional classroom space has also been added including a new Art Room, 2 Flexible Use Rooms and General School Storage Space.

Providing all of the Client’s original goals for a limited budget proved to be the biggest challenge of this project. Through extensive value engineering, the Architect-CM team was able to save $345,000 for the owner without changing the original design goals.